Get in Touch with SINOFUDE Company
| Input | Mechanism to review | Observable output | Buyer-owned criterion |
|---|---|---|---|
| Recipe and heat condition | Flow through transfer, hopper, metering and nozzle path. | Stable feed, clean cut-off and repeatable cavity fill. | Approved product condition during the declared run window. |
| Particle or inclusion | Passage, suspension and distribution through the narrowest path. | No bridging, blockage or unacceptable distribution shift. | Largest particle and permitted distribution pattern. |
| Mould and cavity map | Nozzle position, indexing, silicone molds or rigid mould handling. | Aligned deposit without unacceptable spill or missed cavities. | Approved drawing, cavity count and visible fill standard. |
| Target weight or volume | Metering stability over the planned batch. | Measured piece results across selected cavities and time points. | Buyer-approved range and sampling plan. |
| Cooling and release | Set, handling and demolding after the deposit. | Released pieces with the agreed surface and handling condition. | Product-specific release and appearance standard. |
| Changeover and cleaning | Access, removal path, residue and allergen-control steps. | Documented cleaning observation and open-item list. | Plant procedure, verification owner and release record. |




