Fondant Line
Fondant Production Line for Controlled Creme Preparation
Configure a fondant production line for cooked, cooled, and crystallized confectionery fondant, fondant cream, filling, coating, or formed candy products. Our engineers will review your formula, final state, required output, cleaning plan, and downstream equipment to finalize the machine scope.
- Product first: Formula and finished state define the review
- One line boundary: Cooking through agreed downstream handoff
- BFJ400 reference rate: 400 kg/h
- Real SINOFUDE equipment images
- Formula-led engineering review
- RFQ, FAT, and SAT planning tools
400 kg/h
BFJ400 nominal reference output
20 kW
Published reference connected power
6,400 mm
Published reference machine length
Written Acceptance
FAT and SAT criteria agreed before testing
SINOFUDE Fondant Line Capabilities.
Recipe and process definition
Cooking and syrup transfer
Cooling and crystallization
Forming and downstream handoff
Controls and operating recipes
Factory and site acceptance
Product Brief Inputs and Finished-State Targets
Core Definition
“fondant production” may refer to cream centers, fillings, coatings, poured products, formed pieces, or cake icing. We would appreciate knowing the state that leaves the line, what happens next, and how the buyer determines that the product is acceptable.
Buyers need a product definition before a model choice.
Operational Brief
Cleaning method, allergen changeover, and inspection access belong in the initial brief. Nominal machine speed must be checked against cooling, forming, and packing.
Acceptance Path
New-supplier buyers need a visible scope and acceptance path.
| Input group | Information to provide | Why it changes the line |
|---|---|---|
| Product identity | Fondant cream, filling, coating, deposited mass, formed candy, or rolled icing | Prevents a machine-category mismatch |
| Formula family | Sugar, syrup, water, fat, dairy, fruit, color, flavor, inclusions, and processing aids | Changes cooking, pumping, cooling, cleaning, and allergen scope |
| Incoming condition | Ingredient temperature, solids, batch size, feed form, and variability | Sets the real duty for heating, mixing, and transfer |
| Finished state | Temperature, moisture or water activity, hardness, stickiness, viscosity, texture, and shape | Creates measurable release criteria |
| Output basis | Net kg/h, scheduled hours, product yield, changeovers, and required continuous run | Separates nameplate rate from saleable production |
| Next process | Depositing, forming, enrobing, bake use, cooling, packing, or manual handling | Defines elevation, temperature, controls, and transfer interfaces |
Cooking, Cooling, Crystallization and Forming Modules
Each complete production line is a linked thermal and mechanical process. Only modules that are approved for the product process are integrated, with responsibility identified at every connection.
Step 1 Ingredient preparation
Dissolve and combine the approved sugar, syrup, liquid, and other recipe components under controlled mixing. Powdered additions, milk, butter, fruit, pectin, shortening, or chocolate ingredients need their own addition and allergen plan when present.
Step 2 Cooking and concentration
The cooker establishes the thermal and solids history used by the later cooling stage. No universal cook temperature is published because the correct endpoint belongs to the buyer’s formula and validation basis.
Step 3 Controlled cooling
The mass must cool into an agreed operating window before or during crystallization. Heat-transfer area, flow, residence time, and product viscosity influence the equipment choice.
Step 4 Beating and crystallization
Agitation promotes a fine crystalline structure while the remaining liquid phase supports a cream or paste texture. Continuous fondant machinery can stabilize this stage only when feed conditions stay inside the specified window.2
Step 5 Holding and transfer
Warming, gentle agitation, and sanitary transfer help preserve the agreed handoff condition. Pump selection and pipe routing must account for viscosity, shear sensitivity, drainage, access, and cleaning.
Step 6 Forming or customer interface
The final module can feed a depositor, mold, forming system, dip or coating step, center-filling process, cooling conveyor, or packing line. Interface confirmation covers signals, speed range, product temperature, and physical connection points with both equipment parties.
Processing fondant via continuous method shows how cooled stator and rotor surfaces are able to cool and induce crystallization in the process. It adds no claim that every SINOFUDE integration uses this particular patent or its corresponding parameters.
BFJ400 Reference Configuration and Machine Specifications
The following figures come from a SINOFUDE-affiliated product page and describe one BFJ400 reference configuration. Quotation review confirms them against your recipe, required product state, utilities, layout, destination, and downstream interfaces.
Capacity mismatch becomes a project risk because a nominal rate says nothing about the approved formula, yield, or downstream constraint. SINOFUDE therefore treats 400 kg/h as a reference basis to be tested against one written acceptance boundary.
| Reference item | Published value | Quotation check |
|---|---|---|
| Model | BFJ400 | Confirm final model and included modules |
| Nominal output | 400 kg/h | Define formula, net-output basis, run time, yield, and acceptance sample |
| Connected power | 20 kW | Confirm installed and operating loads plus heating utilities |
| Reference weight | 3,000 kg | Confirm shipping and installed weights |
| Reference length | 6,400 mm (252.0 in) | Allow access, maintenance, pipework, and interfaces |
| Reference width | 1,300 mm (51.2 in) | Check aisles, doors, guards, and operator space |
| Reference height | 2,300 mm (90.6 in) | Check ceiling, services, lifting, and cleaning access |
These values are intended to provide an early estimate of layout and capacity, and should not be understood to provide a guarantee of performance. The written technical agreement and FAT should specify the conditions under which output, product quality, power, and interfaces will be accepted.
Formula and Product State
What Changes: Heating, cooling, mixing, pumping, residence time, and cleaning duty Input That Reduces Uncertainty: Approved formula range and representative samples
Line Boundary
What Changes: Number of modules, controls, guarding, supports, and interfaces Input That Reduces Uncertainty: Process flow and responsibility matrix
Output and Operating Pattern
What Changes: Equipment size, thermal load, buffer volume, and downstream coordination Input That Reduces Uncertainty: Net kg/h plus shift and changeover plan
Destination and Site
What Changes: Electrical design, documentation, packing, freight, installation, and service Input That Reduces Uncertainty: Country, plant layout, utility schedule, and delivery terms
Production Schedule
We schedule production within 90 days after deposit receipt and confirmation of production-related technical details. The quotation should identify when this production period starts and separate transport, installation, and site acceptance timing.
Commercial Terms
SINOFUDE’s stated payment term for this offer is 30% T/T deposit and 70% T/T before shipment. We supply product test samples when agreed; courier or freight charges are paid by the buyer.
This page does not define a list price or a payback period or a savings percentage, as total-cost comparison includes utilities, changeover, cleaning, installation, training, consumables, wear parts, maintenance access, spare parts, and the effect of the slowest downstream step.
Process Control, Cleaning and Acceptance
Process-control review
- Ingredient and feed tolerances
- Cooking endpoint and instrumentation
- Cooling and product-temperature window
- Agitation or beating speed range
- Holding time and downstream handoff
- Alarms, interlocks, and safe-stop behavior
Hygienic-design review
- Product-contact material schedule
- Weld, seam, gasket, and seal details
- Drainability and retained-product points
- Manual access, COP, or CIP boundary
- Cleaning chemicals, time, and temperature
- Inspection, rinse, or swab acceptance
Acceptance evidence to agree
| Test group | Define before FAT | Record at closeout |
|---|---|---|
| Function | Operating modes, alarms, interlocks, sequences, and interfaces | Pass/fail record and punch list |
| Throughput | Formula, run duration, net measurement boundary, yield, and interruptions | Time-stamped production record |
| Product | Sampling point, temperature, moisture, texture, hardness, stickiness, shape, or rheology | Approved sample and measurement results |
| Cleaning | Method, changeover target, access, inspection, and validation responsibility | Observed procedure and open actions |
| Documents | BOM, manuals, drawings, certificates, declarations, calibrations, and spare-parts list | Configuration-linked document register |
Project Delivery from Product Brief to SAT
Define the product.
Include intended use, formula range, finished state limits, output basis, samples and destination.
Review process path.
This reviews the thermal, mixing, cooling, crystallization, holding, forming, and packing interfaces.
Confirm line boundary.
This proposal separates SINOFUDE supply, buyer utilities, third-party equipment, installation work, and site responsibilities.
Freeze the technical agreement.
This confirms the model, modules, product-contact materials, controls, layout, utilities, documentation, and acceptance criteria.
Build and run FAT.
This uses the agreed recipe or representative basis, instruments, run duration, pass/fail criteria, and punch-list process.
Install, train, and close SAT.
Site utilities, interfaces, operator training, calibration, spare parts, and open actions are recorded before acceptance.
Buyer inputs that prevent rework
Provide a current plant layout, utility conditions, feed and discharge elevations, interface signals, cleaning restrictions, destination documents, and the person who approves the product sample.
Supplier outputs that make scope visible
Request an itemized quotation, equipment list, layout, utility schedule, control description, responsibility matrix, FAT plan, document register, spare-parts proposal, and service boundary.